Convention shift: epic folders + PRD filenames + frontmatter id
fields are now bare slugs. The created: timestamp (Phase 2) carries
the date; folder names don't repeat it. A future <task-id>-<slug>
shape (e.g. ClickUp) lands cleanly when that integration ships.
Renames (git mv preserves history):
- docs/work/2026-05-13-binder-wrap-helper/
-> docs/work/binder-wrap-helper/
- docs/work/2026-05-14-library-evaluation-policy/
-> docs/work/library-evaluation-policy/
- docs/work/2026-05-14-ci-security-and-supply-chain/
-> docs/work/ci-security-and-supply-chain/
- docs/work/prds/2026-05-13-binder-wrap-helper.prd.md
-> docs/work/prds/binder-wrap-helper.prd.md
- docs/work/prds/2026-05-13-coverage-architecture.prd.md
-> docs/work/prds/coverage-architecture.prd.md
- docs/work/prds/2026-05-14-library-evaluation-policy.prd.md
-> docs/work/prds/library-evaluation-policy.prd.md
- docs/work/prds/2026-05-14-ci-security-and-supply-chain.prd.md
-> docs/work/prds/ci-security-and-supply-chain.prd.md
Frontmatter updates inside the renamed files: epic id, epic prd,
story epic, PRD id, PRD builds-on all drop date prefixes.
System folder + state file move:
- New docs/work/_system/ holds framework-managed state.
- docs/work/_state.json -> docs/work/_system/_state.json.
- state-builder.mjs adds _system to SKIP_FOLDERS.
- cli.mjs + state-sync-guard.mjs + .husky/pre-commit point at the
new path.
template-reset-v1 epic deleted entirely (one-off cleanup epic from
the pre-date-convention era; status was already done).
Generator-template updates (so new artifacts ship in the right
shape):
- .sandcastle/decomposer.prompt.md emits bare-slug folder names +
ISO created: timestamp.
- .claude/skills/to-prd/SKILL.md template uses bare-slug filename +
bare-slug id field + ISO created: timestamp.
Doc reference updates: glossary, runbook, agent-first-workflow-
and-conformance, reviewer prompt, ADR-020, ADR-022, ADR-023 all
point at the new paths/slugs.
Final sweep for setup-process bookkeeping not caught by template-reset-v1.
ADRs drop Plan-N qualifiers; spec collapses the historical 11-phase
migration table; scaffolding guide drops "Phase added" column; comment
prefixes referencing R-numbers in test describes / eslint inline comments
are normalized. Architecture-level rule IDs (R40, R52, E0, J0, etc.) are
preserved where they serve as stable cross-references in ADRs.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Captures the design from the brainstorm session on agent-first development
in this template. Architecture doc covers the four interlocking pillars:
- Conformance engine (manifest + brands + ESLint + boot + CI gate)
- Agent workflow (PRD -> Epic -> Story -> Task; manifest-first ordering;
TDD per slice; in/out scope at every level)
- Local task system at docs/work/ (filesystem markdown, derived committed
_state.json, single-writer orchestrator rule)
- Sandcastle orchestrator (implementer + reviewer loop, DAG-respecting,
configurable retry cap)
Work-shape guides extend the architecture doc with operational detail for
frontend work (atomic design, Storybook-as-spec, component + Playwright
screenshot test gates, Storybook MCP reviewer integration) and
infrastructure work (ADR-first flow, dedicated ADR elicitation skill,
optional core packages vs. new infrastructure layers).
Phasing is conformance-first: build the enforcement system manually, then
build the dispatch substrate, then migrate remaining features through it.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>