Final sweep for setup-process bookkeeping not caught by template-reset-v1.
ADRs drop Plan-N qualifiers; spec collapses the historical 11-phase
migration table; scaffolding guide drops "Phase added" column; comment
prefixes referencing R-numbers in test describes / eslint inline comments
are normalized. Architecture-level rule IDs (R40, R52, E0, J0, etc.) are
preserved where they serve as stable cross-references in ADRs.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
- Rename docs/decisions/adr-012-lazar-conformance.md → adr-012-feature-conventions.md
- Strip "Lazar", "Plan 8/9/10/11", "refactor-logs" refs from all ADRs,
architecture docs, HTML explainers, and feature/core AGENTS.md files
- Update all incoming links in docs/, packages/*/AGENTS.md, HTML explainers
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>