Commit Graph

4 Commits

Author SHA1 Message Date
90fc2853f2 feat(work): add ISO timestamps + auto-bump on staged work-doc changes
- New scripts/work/bump-updated-timestamps.mjs stamps the `updated:`
  frontmatter field to the current ISO 8601 UTC timestamp on every
  staged docs/work/**/*.md file. Idempotent; adds the field after
  `created:` if missing.
- .husky/pre-commit invokes the bump script as step 2 (before
  rebuild-state) so _state.json sees the fresh timestamp.
- Backfill all existing work docs (4 PRDs + 3 epics + 21 stories):
    * created: promoted from \`YYYY-MM-DD\` -> ISO timestamp using
      git log --diff-filter=A on each file (first-commit date for
      stories that had no \`created:\` line, midnight UTC for PRDs
      and epics that had date-only created).
    * updated: added from \`git log -1 --format=%aI\` on each file
      (last-commit timestamp); will be re-stamped to "now" by the
      pre-commit hook on this commit.

Stories that had no \`created:\` line now get one.
2026-05-14 21:10:34 +02:00
3fc5c0f1ca feat(work): auto-tick epic story bullets when a story finishes
- Add tickStoryBulletInEpic(workRoot, epic, story) helper that finds
  the bullet in the parent epic's `## Stories` section linking to the
  given story folder and flips `- [ ]` to `- [x]`. Idempotent.
- applyApprovedState now ticks the parent epic bullet whenever a
  story flips to status: done (alongside the existing per-task tick
  and epic-status flip). Epic file gets staged on either ticked-or-
  flipped, not just flipped.
- Backfill all 3 existing epics: 21 bullets ticked to match their
  already-done story statuses (binder-wrap-helper x3, library-
  evaluation-policy x9, ci-security-and-supply-chain x9).
2026-05-14 21:05:06 +02:00
dd58974067 chore(work): finish epic 2026-05-14-ci-security-and-supply-chain 2026-05-14 20:17:29 +02:00
c17d3f147d chore(work): decompose 2026-05-14-ci-security-and-supply-chain epic
Decomposer produced 9 stories under docs/work/2026-05-14-ci-
security-and-supply-chain/, ordered to land the schema foundation
first and the cross-referencing content (reviewer prompt, guide)
last:

01 - trace schema extensions (socketRisk + lastRevalidated)
02 - Socket integration (skill + CI)
03 - Renovate adoption
04 - major-bump re-evaluation flow
05 - trace revalidation workflow
06 - CodeQL + audit signatures
07 - gitleaks pre-commit
08 - reviewer prompt update
09 - CI security guide + docs

Also fixes a one-char status typo in the PRD frontmatter
(\`appoved\` -> \`approved\`) that landed with the decompose run.

Anchored by ADR-023 + the approved PRD at
docs/work/prds/2026-05-14-ci-security-and-supply-chain.prd.md.
Sequencing: depends on stories 01/02/04/06 of the in-flight
library-evaluation epic landing first.
2026-05-14 18:59:12 +02:00